Bracknell BID funded vegetation and grass verge cutbacks on Downmill Road - Bracknell BID
After Downmill Road 2

Bracknell BID funded vegetation and grass verge cutbacks on Downmill Road


The BID has funded the improvement of cycle path vegetation and grass verges on Cookham Road, Longshot Lane and Downmill Road as part of its aims to improve the general condition and appearance of roads, footpaths, cycle ways and verges, raising the appearance of the business areas.

This project ties into the BID’s overall strategy to improve connectivity across the BID area, with a new footpath added on Longshot Lane with vegetation cutbacks, complimented with fingerpost signage, which can be read about here.

Before: Downmill Road
Before: Downmill Road
After: Downmill Road
After: Downmill Road

Related Articles

Meet Your Neighbour Business Breakfast – 5th March 2025

Bracknell BID arranged and hosted a 'Meet Your Neighbour' Business Breakfast networking event on Wednesday the 5th March 2025, at The Capitol Building, Oldbury, Bracknell. ...

Basic Life Support Awareness Training Course – 11th February 2025

Bracknell BID funded and hosted a Basic Life Support Awareness Training Course at Regus, Bracknell on 11th February 2025, led by the South Central Ambulance ...

Bracknell-based asset finance firm surges to top 10 amongst industry titans

The country’s largest independent lessor resides outside of London’s finance district, PEAC Solutions UK is right here in Bracknell. PEAC Solutions stands for Pan-European Americas ...
Scroll to Top