Two new BID funded fingerposts installed - Bracknell BID

Two new BID funded fingerposts installed


The BID has funded and installed two new fingerposts at either end of the pathway linking Downmill Road and Longshot Lane. These posts contain place names and distances of destinations in each direction, improving wayfinding and connectivity for pedestrians and cyclists. These fingerposts are part of a wider strategy to improve wayfinding and connectivity throughout the BID area.


Related Articles

Meet Your Neighbour Business Breakfast – 5th March 2025

Bracknell BID arranged and hosted a 'Meet Your Neighbour' Business Breakfast networking event on Wednesday the 5th March 2025, at The Capitol Building, Oldbury, Bracknell. ...

Basic Life Support Awareness Training Course – 11th February 2025

Bracknell BID funded and hosted a Basic Life Support Awareness Training Course at Regus, Bracknell on 11th February 2025, led by the South Central Ambulance ...

Bracknell-based asset finance firm surges to top 10 amongst industry titans

The country’s largest independent lessor resides outside of London’s finance district, PEAC Solutions UK is right here in Bracknell. PEAC Solutions stands for Pan-European Americas ...
Scroll to Top